| Strategic Core
Business > Engineering & Technology
> Quantity Surveying
|
Quantity Surveying
|
| Any inquiries
regarding the above courses shall be referred to the respective
officer as listed below:
| Tel |
: |
(603) 8738
3388 |
| Fax |
: |
(603) 8736
9908 |
|
|
ACQUISITION AND
DESIGN & BUILT PROJECT CONTRACT MANAGEMENT
(UBA 3) |
|
Course Objectives:
-
To understand concept
and usage in project implementation.
-
To identify clients and
employer’s requirements.
-
To increase current
knowledge and practice.
Course Contents:
-
Introduction and
overview
- Definition.
- When to use.
- Parties involved.
- Characteristics and differences.
- Role and obligation of parties.
-
Pre-contract
implementation
- Work process.
- Methods of tender.
- Employer’s requirements.
- Pre-bid document.
-
Post-contract
Implementation
- Work process.
- Contractor’s obligation.
- Programme of works.
- Payment.
- Managing variations.
- Completion & Non completion.
- Defects Liability Period & Maintenance.
- Final accounts.
-
Contract conditions.
Course Methodology:
Lectures, practical and group discussions.
Target Group:
Quantity Surveyor an Professional Group.
Duration:
4 days.
|
|
PROJECT
MANAGEMENT
(UBA 2) |
|
Project Management is
an important element in the Construction Industry. Effective implementation
of Project Management ensures the timely completion of construction works
within allocated costs and required quality.
Course Objectives:
-
Understanding the Principles and Process of
Project Management.
-
Using Planning and Monitoring Techniques.
-
Using Project Cost Estimation Method.
-
Preparation of Project Cash Flow System.
Course Contents:
-
Introduction to the Principles and
Concept of Project Management.
-
The Role and Function of a Project
Manager.
-
Techniques and Project Monitoring
Planning.
-
Project Financial Management.
-
Techniques of Project Evaluation.
-
Tender Procedure and Tender
Administration.
-
CPM.
Course Methodology:
Lectures and Practical. Target Group:
Professional group. Duration: 4
days.
|
|
ARBITRATION IN BUILDING CONTRACT
(UBA 7) |
|
This course identifies the characteristics
and effectiveness of arbitration procedures in building contract.
Course Objectives:
-
To identify issues and current development
in arbitration procedures and to provide advisory service in the related
matters.
-
To explain arbitration procedures and
methods to increase efficiency in the arbitral proceedings.
Course Contents:
-
Introduction to arbitration.
-
Local and Foreign arbitration system.
-
Legal implementation of arbitration
system.
-
Arbitration proceedings.
Course Methodology:
Lectures and Practical. Target Group:
Quantity Surveyor and Professional group.
Duration:
4 days.
|
|
VARIATIONS WORK, CLAIMS AND
ADJUSTMENT OF CONTRACT SUM
(UBE 3) |
|
To provide understanding regarding claims
resulting from variations work and the preparation of contract cost
adjustment based on JKR’s circular and procedures.
Course Objectives:
-
Specific knowledge on variations work,
claims, adjustment of contract sum in line with contractual requirements in
effect.
-
Efficient contractual administration.
Course Contents:
-
Definition and condition of contract and
Treasury’s Instructions.
-
Variations order instructional
procedures.
-
Adjustment of contract sum.
-
Contract procedures and estimation.
Course Methodology:
Lectures and Practical. Target Group:
All.
Duration:
3 days.
|
|
TENDER PROCEDURE /DEPARTMENTAL
CONTRACT & CONDITIONS OF CONTRACT (WORKS CONTRACT)
(UBE 4) |
|
To provide knowledge on works contract
administration in accordance with JKR’s and Ministry of Finance’s current
circulars. Emphasis on important clauses of the conditions of contract.
Course Objectives:
Course Contents:
-
Introduction to the types of contract.
-
Document preparation and tendering
procedures.
-
Evaluation and acceptance.
-
Contract document preparation.
-
Understanding JKR 203 Conditions of
Contract.
Course Methodology:
Lectures and Practical. Target Group:
All.
Duration:
3 days.
|
|
EARTHWORK QUANTITIES
(UBE 5) |
|
To enable participants to measure earthwork
quantities such as areas required to be cut and filled.
Course Objectives:
-
To measure and provide list of quantities
for Site preparation, Embankment, Rubble Pitching, Abutment and Gabion.
Course Contents:
-
Construction aspects, Measurement
Specifications, Amplification and Pricing factors, Provision in SMM and
Site preparation.
-
Types of plant and machinery for
earthworks.
-
Concept and measurement method.
Course Methodology:
Lectures and Practical. Target Group:
All.
Duration:
3 days.
|
|
PILING WORK QUANTITIES
(UBE 6) |
|
To enable participants to measure and
provide cost estimate effectively.
Course Objectives:
Course Contents:
-
Construction aspects, Measurement
Specifications, Amplification and Pricing factors, Provision in SMM.
-
Types of piles such as concrete pile,
timber pile and steel pile.
-
Types of plan.
-
Concept and measurement method.
Course Methodology:
Lectures, Practical and Group Discussions.
Target Group: All.
Duration:
3 days.
|
|
PROJECT COST ESTIMATION
(UBE 8) |
|
To provide building works estimates for
project tender participation.
Course Objectives:
-
To understand the elements of building and
engineering works including estimates costing and tender.
-
Understanding project cost estimates and
methods of preparing and planning estimation.
-
Understanding accuracy and estimation
strategy.
-
Knowledge on scope of building and
engineering works and preparation of detailed estimation.
Course Contents:
-
Introduction to construction industry and
elements of building and engineering works.
-
Tender and project cost estimates.
-
Accuracy and estimation strategy.
-
Scope of building and engineering works
and detail of estimation.
-
Scope and types of engineering and
practice of standard measurement in Road, Bridges and Retaining Wall
works.
-
Scope in engineering, quantity
measurement, estimation preparation and estimation analysis works.
Course Methodology:
Lectures and Practical. Target Group:
All.
Duration:
3 days.
|
|
 |
|